Stage 1 Stage 2 Stage 3 Stage 4

The Foundation Stage

To reach Stage One, the house pad must be placed, all necessary plumbing and electrical installed and the foundation must be poured.

The Dry in Stage

Stage Two is complete when all the home’s interior and exterior walls are set, the roof framing is finished, and the home’s shingles, windows, and exterior sheathing have been installed.

The Rough in Stage

To reach Stage 3, the electrical, HVAC, and plumbing systems must be completed.

The Close in Stage

To reach stage Four, the brick, stucco, or siding exterior of your home, the wall insulation and the interior walls must be completed.
Stage 5 Stage 6 Stage 7

The Interior Trim Stage

Stage Five is complete when your interior doors are set, the cabinets and counter tops have been installed, the moldings are in place and the painting is completed.

The Trim out Stage

To reach Stage Six, your home's plumbing and electrical fixtures will be set, air condition grilles will be installed, the flooring installed and the final painting will be completed. During Stage Six, the Project Manager, will perform a quality inspection on your home. He will perform a walk through with you to make sure that we have not overlooked any items. Should an item require attention, a final punch list will be completed to make sure that the item is taken care of before closing on the house.

YOUR HOME IS COMPLETE!

Your Personal Builder will now perform a final walk through with you to make sure that any items identified in Stage 6 have been completed to your satisfaction. All that's left is closing; in less than ten days, your new Home will be ready for move-in!